CAMBRIDGE PLACE, W8
House refurbishment London involved: demolition works to the roof, all internal and external, raising the roof, Velux windows, flat roof windows, installation of a new roof, structural calculations and drawings, structural steel installations, new base-floors, new sash windows and french doors, refurbishment of the existing sash windows, glass balustrades, bespoke staircases, new plumbing including boiler installation, underfloor heating to all floors; two bathroom installations with wet room, architectural concrete looking walls, one toilet installation, kitchen installation, network wiring, reclaimed wood flooring, carpentry, electric works - complete rewiring, painting and decorating works inside out. Bathroom refurbishment involved: installation of two bathrooms, one as a wet room, second with a wet shower, architectural concrete to walls in the shower, reclaimed wooden floor, custom made shower enclosure, custom shower screen, tiling and decorating works.
BEFORE AND DURING WORK