PIANO LANE, N16
Werner and Werner Ltd prepared all documentation for the project including: job specification, risk assessment and method statements for building management company.
Office refurbishment project included: demolishing works up to the shell, forming new stud walls, installation of two toilets and one disabled toilet, shower room; installation of kitchenette; intumescent painting of steel structural columns, rewiring and electrics including installation of network cabling, electrical radiators, intruder alarm system, fire alarm system and safety signage; installation of ventilation system; plumbing including electric water heater and constant boiling tap; installation of engineered wooden floor, tiling, drywall, plastering, painting and decorating.
Office refurbishment project included: demolishing works up to the shell, forming new stud walls, installation of two toilets and one disabled toilet, shower room; installation of kitchenette; intumescent painting of steel structural columns, rewiring and electrics including installation of network cabling, electrical radiators, intruder alarm system, fire alarm system and safety signage; installation of ventilation system; plumbing including electric water heater and constant boiling tap; installation of engineered wooden floor, tiling, drywall, plastering, painting and decorating.